Confirm that sourcing, fabrication, inserts, wiring, electronics, battery, and actuator preparation are complete.

Self-source path

This gate checks self-source production work only. Both paths converge at First-Time Software and Motor Setup after this page.

Self-Source Path Check

  • Compatible hardware, CAD, BOM, wire, electronics, and firmware revisions are recorded.
  • Purchased and manufactured quantities match the released BOM.
  • Custom parts match the specified material, process, finish, and revision.
  • Mechanical parts passed visual and dimensional inspection.
  • All required heat-set inserts are installed and accepted.
  • Normal harnesses were manufactured, labeled, and electrically tested from the released manifest.
  • Wago and soldered pass-through wires remain unjoined and assigned to assembly steps.
  • All electronics and safety hardware passed physical incoming inspection.
  • A compatible battery and installed power-system hardware are identified and inspected.
  • All 25 actuator models and unique numbered stickers are present and recorded for common setup.
  • Rejected, missing, substituted, or quarantined items are resolved.
  • The laptop, data USB-C cable, 32 GB or larger microSD card, reader, and Ethernet cable are ready for common setup.

If any released source or acceptance procedure remains TBC, do not substitute assumptions to complete this gate.