Step 3: Prepare the Bearing Housing
Install three M4 square nuts, lightly tighten three M4x16 socket bolts, and fit one flanged ball bearing in part 400_13C.
Parts needed
| Part | Count |
|---|---|
| 1 | |
| M4 square nuts | 3 |
| M4x16 Socket bolts | 3 |
| Flanged ball bearing 4390N159 | 1 |
Instructions
Take part (the part with a side cable channel, not part ) and place it on a flat surface with the inner hollow facing upward.
Place 3 — M4 square nuts into the 3 slots on the surface of Part .
Using 3 – M4x16 Socket bolts and lightly tighten it on the circumference of Part where you have previously inserted the square nuts to secure the square nuts in place first. If you over tighten, it will prevent the actuator from fitting in later on.
Place flanged ball bearing 4390N159 into the bearing hole on Part .
How is this guide?
Step 2: Attach the Shoulder Base and Route the Cable
Fasten part 400_02A to actuator ID 13, connect the cable's XT30 connector to the actuator port, and route the cable through the actuator shaft.
Step 4: Prepare the Actuator Housing
Install seven M4 square nuts in part 400_14C and retain them with three M4x16 and four M4x25 socket bolts.