Step 4: Prepare the Actuator Housing
Install seven M4 square nuts in part 400_14C and retain them with three M4x16 and four M4x25 socket bolts.
Parts needed
| Part | Count |
|---|---|
| 1 | |
| M4 square nuts | 7 |
| M4x16 Socket bolts | 3 |
| M4x25 Socket bolts | 4 |
Instructions
Take part , put it on a flat surface with the inner hollow part facing upward
Put 3 – M4 square nuts into the 3 slots on the surface of Part
Using 3 – M4x16 Socket bolts and lightly tighten it on the circumference of Part where you have previously inserted the square nuts to secure the square nuts in place first. If you overtighten, the actuator will not fit in later on.
Put 4 – M4 square nuts into the 4 slots on the round circumference of Part
Using 4 – M4x25 Socket bolts and lightly tighten it on the circumference of Part where you have previously inserted the 4 square nuts to secure the square nuts in place first.
How is this guide?
Step 3: Prepare the Bearing Housing
Install three M4 square nuts, lightly tighten three M4x16 socket bolts, and fit one flanged ball bearing in part 400_13C.
Step 5: Connect the Shoulder Cable Connectors and Position the Actuators
Seat actuator ID 14 in part 400_14C, connect the XT30 cable connectors to actuators ID 14 and ID 15, and route the single-ended cable through actuator ID 15.